Skip to content

SOLAR SYSTEM ENGINEERING

Solar Panel Installation in Islamabad & Rawalpindi

Request a solar installation quote in Islamabad or Rawalpindi, report a fault on an existing system, or arrange routine maintenance. Share your area, recent electricity use, and backup priorities.

Call +92 348 5029264

Compare solar configurations

Daytime loads

Consider on-grid solar when most usage is during daylight and backup is unnecessary.

Essential backup

Consider hybrid with storage when circuits such as lighting, refrigeration or internet need to stay on during outages.

Site and quote

Ask for the system size, battery usable capacity, protection hardware, installation scope and warranty terms in writing.

Solar panels installed on a metal roof in Islamabad daylight
Clean array layout with DC conduit routing and earthing protection.

On-grid, off-grid or hybrid under NEPRA 2026 Net Billing

Under NEPRA (Prosumer) Regulations, 2026 (effective February 9, 2026), new residential and commercial connections in Islamabad & Rawalpindi operate on Net Billing: electricity imported from IESCO is billed at your applicable slab/ToU tariff (Rs 37–55+/unit with surcharges & GST), whereas exported solar surplus is credited separately at NEPRA’s National Average Energy Purchase Price (Rs 8.13/unit NAEPP base) under a 5-year agreement.

Because daytime self-consumption avoids expensive slab imports while exports earn Rs 8.13/unit, pairing an On-Grid or Hybrid system with load-matched sizing—or a Hybrid LiFePO4 battery bank to shift afternoon surplus into evening AC/home use—delivers stronger bill savings. Pre-February 9, 2026 existing net-metering consumers remain grandfathered on 1:1 agreements under S.R.O. 547(I)/2026 unless they alter sanctioned capacity.

IESCO Green Meter & Regulatory Filing Checklist

We prepare complete IESCO prosumer files with NEPRA-approved Tier-1 inverters, anti-islanding protection, earthing test certificates, and Certificate of Compliance (COC) testing.

  • Agreement term: 5 years for new 2026 Net Billing applicants (7 years grandfathered for pre-Feb 9, 2026 contracts)
  • System sizing cap: Up to 1 MW, matched to your utility sanctioned load (3-phase meter required for larger loads)
  • Smart self-use optimization: Prioritize daytime appliances or Hybrid LiFePO4 storage before feeding surplus to the grid

Report a problem with an existing solar system

For low generation, repeated alarms, battery issues, or missing monitoring data, share your city, system age, inverter and battery make/model, and the exact fault code and symptoms. Include when the problem started and any available monitoring history.

  • DC isolator, SPD, and string voltage verification under sunlight
  • Inverter MPPT tracking and grid-synchronization checks
  • Battery charging curve, BMS communication, and cutoff threshold review
  • Array cleaning, thermal inspection of MC4 connectors, and earthing resistance testing

5 kW vs 10 kW Solar Sizing Guide

Adjust your average monthly electricity consumption and backup preference to compare typical 5 kW and 10 kW system scopes before requesting a site survey.

200 Units1,000 Units2,000 Units
Outage Backup Requirement
Suggested System Size
10 kW Hybrid
Est. Monthly Yield
~1250 kWh
Approx. Panel Count
18 Panels

Hybrid + LiFePO4 battery: stores surplus daytime solar for evening self-consumption (avoiding Rs 45+/unit IESCO evening imports) instead of exporting at NEPRA Net Billing buyback (~Rs 8.13/unit).

NEPRA Prosumer Policy (2026): New IESCO connections after Feb 9, 2026 settle exports at Rs 8.13/unit (NAEPP base) under a 5-year Net Billing contract; pre-Feb 2026 contracts remain grandfathered 1:1 via S.R.O. 547(I)/2026.